Monday, July 8, 2013

Unit reassembled (without the shell)

Since mid-Saturday (Jul 6) and up to Thursday, much work is scheduled around AdSec-DX with the visit of Roberto Biasi from Microgate assisted by LBTO staff and remotely by the Arcetri group.

So far, the team is on schedule. The system has been fully reassembled without the shell and partially tested (first power-up and test of a selection of actuators to validate the flat cables connection). Some time was also spent analyzing the actuators depth variations versus elevation angle (more to come on this later).


 Pressure tests of the cooling system.  The unit is inverted for protection 
of the actuators, cold plate, and reference body in the event of a leak.